Sunday, March 15, 2009

Another week has flown by & I am still here, 3/15/09

It is amazing the things I can do and the things I can't do quite right. Tiffaney's trailer was moved to Deer Park and it needs the water, sewer and electricity all run. The plumbing stuff was easy except that I had to crawl under the trailer to do it. It is still a struggle to get on the ground and harder to move around. My hardheadedness helps me get this done, but the pain is still there. There is not enough room under it to sit or move easily. Most of this had to be done while laying on my back. Moving from one spot to the next is still difficult, but I had to do this instead of having Tiff pay a plumber his fee for it. The electrical was much harder! I put all this wiring inside 2" piping all on the ground. I found out after I had run it on the ground that it either had to be 18" under ground or off the ground, suspended from the trailer. I had to pull all of this wiring back out and attach it to the bottom of the trailer. This meant it had to run OVER the sewer line. This wiring is SO HEAVY. I could not lift it up to bolt it in place. At first, I used a block of cement and a small piece of piping to get it close and attach the holder in place. After this, I started using rope to tie each piece in place until I could get the holder attached. This worked out OK except once the holder was attached, the rope had to be removed before tightening the holder. The hardest part was getting this OVER the sewer line without messing this piping up. The ground under the trailer is hard, which is hard on my tailbone. When I was under there and needed something else to continue, I had to work my way out to get it. It was a long, time consuming progress, but I got most of it done in one LONG day. The last little bit at the incoming box was a challenge, too. I could not put it together to get length of piping, so I got it as close as I could and had to cut the pipe to the length I though was right. It turned out to be a little long so I had to cut it again. This time it was a little short. That's my luck, huh? To get this to fit, I had to remove the last bracket in to make it fit. Once it was right, I had to glue the last few pieces in place. I had a friend that is a state certified electrician come by and check everything to make sure I did everything correctly. He was impressed with the way it all came out and everything looked great. He checked and tightened all connections and said it was ready to go. Now I have to get a "Deer Park approved" electrician to check it AGAIN so power can be turned on. We have one scheduled for Monday but they want $350 to do it. I think this is an easy way for them to make EASY money, but they have to be "certified" by Deer Park to get the city's permit so power can be turned on. Plumbing is the same way, but we can't get a "certified" plumber to call us back. Until we find one, we won't have water or sewer either. Next, I started working on the porch. We (Tiff and I) took the old deck apart and started on it Saturday, but with all the rain we are getting, I could not go very far. It is supposed to rain again today, but the weather is supposed to be better tomorrow (Monday). We are not going to try to fight this rain today, so I know where I will be tomorrow. This is easier because I am upright instead of being under the trailer. Moving and holding these boards is tough, but Tiff is a lot of of help doing this.
Life is wonderful and, yes, I SHOULD NOT be able to do this stuff, but God has helped me to be able to do it. He is such an inspiration to me to allow me the ability to do these things! I guess that is why I am is such a good mood most of the time and able to do things that the hospital told me I would not be able to do.

No comments: